TCN compensates residents over transmission infrastructure expansion along Kaduna-Kano axis

May 11, 2026 - 19:00
 0  0
TCN compensates residents over transmission infrastructure expansion along Kaduna-Kano axis

The Transmission Company of Nigeria (TCN) has commenced the second phase of compensation for Project Affected Persons (PAPs) impacted by the 330kV Double Circuit QUAD Conductor Mando–Rimin Zakara transmission line...

The post TCN compensates residents over transmission infrastructure expansion along Kaduna-Kano axis appeared first on Tribune Online.

What's Your Reaction?

Like Like 0
Dislike Dislike 0
Love Love 0
Funny Funny 0
Angry Angry 0
Sad Sad 0
Wow Wow 0